The interior of the new centre is almost finished – there was a slight delay as the floor has not dried sufficiently to allow the floorers to fit the new floor. A further inspection will be carried out next Tuesday and if successful, the floor will be laid on the following day. The underfloor heating is up and running, the solar panels are ready to be commissioned ( if the sun ever shines again). The decorators are finishing off the final touches, the hearing aid loop is fitted ready for the audio system, plumbers are ready to fit the loos as soon as the floor is fitted. The electrics are finished.2013-10-08 14.45.50

You may notice that the two large yew trees that threatened to block the access and light to the centre have now been cut down. We received permission from both the council and the Diocese on the condition that we replace them with two similar trees. We intend to reinstate two new Iberian Yews on either side of the new main entrance pathway.

The roadway works were  necessary to comply with current fire safety regulations and have caused a degree of difficulty for which we apologise. The kerbs and bases have all been finished and the levels sorted so we are ready for the tarmac team next Wednesday 30th and Thursday 31st.  The work will be noisy and dirty and for safety reasons it will be necessary to close both the church and the car park for those 2 days. Everything should be back to normal however ( with nice flat paths) by the end of next week.

We hope to be able to confirm a date for the congregation to take a first look around the centre very soon. Look at the photo gallery here.

Take an early sneak preview of our new Community Centre website

2013-10-22 10.52.33