{"id":557,"date":"2013-03-19T10:22:39","date_gmt":"2013-03-19T08:22:39","guid":{"rendered":"http:\/\/www.christchurchswindon.co.uk\/blog\/?p=557"},"modified":"2013-03-19T10:22:39","modified_gmt":"2013-03-19T08:22:39","slug":"buildings-and-site-development-committee-march-13","status":"publish","type":"post","link":"https:\/\/www.christchurchswindon.co.uk\/blog\/2013\/03\/buildings-and-site-development-committee-march-13\/","title":{"rendered":"Buildings and Site Development Committee &#8211; March 13"},"content":{"rendered":"<p>Present : \u00a0Stephen Grosvenor, Mike Palmer, Daniel Pitt, John Plaister<\/p>\n<div>\n<p>Aplogies: Mark Antell,Kevin Penfold<\/p>\n<\/div>\n<p>SG said a short prayer.<\/p>\n<p><b>\u00a0<\/b><b>Item 2. Minutes of last meeting<\/b> \u2013 reviewed \u2013 agreed.<\/p>\n<p>All outstanding items have been included in the agenda.<\/p>\n<p><b>Item 3 \u2013Budget Summary ytd \u00a3596.00<\/b><\/p>\n<p>Damp solution \u2013 redecoration 31 Cricklade \u00a354<\/p>\n<p>Boiler Checks &#8211; \u00a3156<\/p>\n<p><b>Action SG to add 2013 costs to each minute to build up a complete history of costs per year.<\/b><\/p>\n<p><b>Item 4 &#8211; Christ Church<\/b><\/p>\n<p><b>\u00a0<\/b>a) West porch plan. We have now received an outline proposal from AFK which broadly establishes that the restoration of the west porch is feasible. He has supplied some sketches which we will use as part of a broader consultation exercise with the congregation. <b>ACTION:SG to discuss possible costs with AFK<\/b>.<\/p>\n<p>b) We will need DAC faculty for the porch \u2013 the plans incorporate removing a small number of pews at the rear of the church to increase the circulation space and to accommodate a new position for the Audio visual console.<\/p>\n<p>c) LED Lighting AFK and Binary electronics have had a fruitful collaboration and have created a new design proposal for an LED based pendant lighting scheme. We will use this to communicate the proposed LED trial in the Lady Chapel to the wider congregation and initiate a discussion on lighting in general. <b>ACTION: MP to complete temporary licence application \u2013 SG to write to the DAC and advise them of our intentions re the lighting and seek their support. SG to forward the designs and proposal to PCC (Peter Ford) for a resolution to commit to the LC trial<\/b><\/p>\n<p>d) AV update. MP updated us on the latest quote and advice from SMS. They have quoted an overall figure of \u00a312k to cover our basic requirements plus a new mixing console. Their advice was however that we could probably do the installation of new radio mikes and receivers ourselves. Bernard Oxborrow has been thinking about how this could be done. <b>Proposal to replace 2 of the broken radio mikes with new ones<\/b> <b>accepted<\/b>\u2013 this will solve our immediate problems. We can then review performance and decide on the next steps.<\/p>\n<p>e) South transept window repairs &#8211; No further progress on this at this time. <b>ACTION SG to follow up with AFK for his suggestions on masons and with Rob Fleming who is going to be doing some of our monument moving.<\/b><\/p>\n<p>f) Asbestos removal from church undercroft. We have had a quote and this work should be done as soon as possible<b>. ACTION MP to find quote and confirm costs \u2013 proposal is to proceed to get the works completed so we can continue to safely use the storeage.<\/b><\/p>\n<p><b>Item 5. St Mary\u2019s Church \u2013 <\/b>no current issues<b><\/b><\/p>\n<p><b>Item 6 Community Centre update<\/b><\/p>\n<p>a)\u00a0\u00a0 Works timetable &#8211; \u00a0as part of the general communications on D&amp;R planned for next Sunday, SG has produced a comms board explaining the order of work, timetable, information on the design, GS heating &amp; Solar panels etc.<\/p>\n<p>b)\u00a0\u00a0 Kitchen Design \u2013 We are unable to claim kitchen equipment (Cookers, Fridges etc as zero rated under the main project so we have elected to source the equipment and design ourselves. The intention is to have a well-equipped, good quality, finishing kitchen capable of delivering community style catering requirements. Designs are being developed and consultation with interested parties will start in the next couple of weeks.<\/p>\n<p><b>c)\u00a0\u00a0\u00a0 <\/b>Contractor. Timberworks has been selected as main contractor for the works and the contract was signed in February as planned. The contract value is \u00a3612k but the outstanding quotation from Southern Electric to provide 3 phase electric power to the new centre has now come in at \u00a312,745 making a total estimated spend of \u00a3624k.<b><\/b><\/p>\n<p>d)\u00a0\u00a0 Burial Ground lighting proposal. As part of the contractors quote we have included an external lighting ring. We intend to install suitable low level lighting to the pathways around the churchyard to ensure safe access. Details of the installation will be finalised later in the year.<\/p>\n<p>e)\u00a0\u00a0 Hall contents and reclamations. In line with our previous proposals to sell off or donate the unwanted hall contents MP reported a contribution of \u00a3172 to D&amp;R funds from the sale of assorted tables, screens and redundant electrical equipment \u2013 thanks go to Mike and ebay. The wooden floor has been comprehensively reclaimed and donations have been received from the new proud owners of a bit of CC history \u2013 this has earned around \u00a3800 so far.<\/p>\n<p>f)\u00a0\u00a0\u00a0\u00a0 Rubbish arrangements \u2013 Once we have cleared the existing burning pile ready for the new Garden, it will be important to establish a new regime for rubbish and recycling in the burial ground and church. We have made provision for a new hard standing area for rubbish bins at the N.E .end of the car park but we need to finalise the refuse policies and supplier as soon as possible. This is being done in partnership with the Burial Board. <b>ACTION MP to follow up with Bernard and Pam.<\/b><\/p>\n<p>g)\u00a0\u00a0\u00a0 Access \u2013 there may be some difficulties with access to the church during busy periods on site \u2013 the Alms house residents may be affected as the drilling for the GS heating is done. MP has spoken to Harry \u2013 Timberworks will be circulating contact details of the site foreman so that everyone knows who to talk to if there are any issues.<\/p>\n<p><b>Item 7 Property Checks \u2013 <\/b><\/p>\n<p>Annual Property check carried out on 32.<\/p>\n<p>a)\u00a0\u00a0 Re-plastering required following difficulties with<br \/>\ndamp and mould in the dining room. <b>ACTION MP to recommend some plasterers to occupant so that she can arrange for them to visit and quote.<\/b><\/p>\n<p>b)\u00a0\u00a0 PV Front door may need replacing as it doesn\u2019t fit properly and is very drafty \u2013 SG suggested it might be fixable \u2013 <b>ACTION \u2013 SG to hand details of Double glazing doctor to occupant to see it he can fix it. If not we will need a quote for a new door.<\/b><\/p>\n<p>c)\u00a0\u00a0\u00a0 The light fitting over the stairs is broken and cannot safely be replaced due to its position. <b>ACTION: Find electrician willing to move the fitting to a more accessible position<\/b><\/p>\n<p>d)\u00a0\u00a0 The boiler has failed and has a leak \u2013 it is recommended to replace \u2013 we have a proposed plumber \u2013 Gary Hall. <b>ACTION: Get quotes<\/b><\/p>\n<p>e)\u00a0\u00a0 Thanks are owed to Daniel P who has sorted out the reported damp in 31 The room has been de-moulded and the wall paper stripped and repainted.<\/p>\n<p>f)\u00a0\u00a0\u00a0\u00a0 New smoke alarms fitted in 31 but are needed in 32.We also need to fit Carbon Monoxide monitors.<\/p>\n<p><b>Item 8 Any other business<\/b><\/p>\n<ol>\n<li>Weshould review the PAT testing process\/ fire extinguisher checks<\/li>\n<\/ol>\n<p>Next Meeting: 8<sup>th<\/sup> May 7.30 \u2013 51a Broome Manor Lane, SN3 1NB<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Present : \u00a0Stephen Grosvenor, Mike Palmer, Daniel Pitt, John Plaister Aplogies: Mark Antell,Kevin Penfold SG said a short prayer. \u00a0Item 2. Minutes of last meeting \u2013 reviewed \u2013 agreed. All outstanding items have been included in the agenda. Item 3 \u2013Budget Summary ytd \u00a3596.00 Damp solution \u2013 redecoration 31 Cricklade \u00a354 Boiler Checks &#8211; \u00a3156 Action SG to add 2013 costs to each minute to build up a complete history of costs per year. Item 4 &#8211; Christ Church \u00a0a) West [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[8,4],"tags":[],"class_list":["post-557","post","type-post","status-publish","format-standard","hentry","category-site-development","category-news"],"_links":{"self":[{"href":"https:\/\/www.christchurchswindon.co.uk\/blog\/wp-json\/wp\/v2\/posts\/557","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.christchurchswindon.co.uk\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.christchurchswindon.co.uk\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.christchurchswindon.co.uk\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.christchurchswindon.co.uk\/blog\/wp-json\/wp\/v2\/comments?post=557"}],"version-history":[{"count":1,"href":"https:\/\/www.christchurchswindon.co.uk\/blog\/wp-json\/wp\/v2\/posts\/557\/revisions"}],"predecessor-version":[{"id":558,"href":"https:\/\/www.christchurchswindon.co.uk\/blog\/wp-json\/wp\/v2\/posts\/557\/revisions\/558"}],"wp:attachment":[{"href":"https:\/\/www.christchurchswindon.co.uk\/blog\/wp-json\/wp\/v2\/media?parent=557"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.christchurchswindon.co.uk\/blog\/wp-json\/wp\/v2\/categories?post=557"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.christchurchswindon.co.uk\/blog\/wp-json\/wp\/v2\/tags?post=557"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}